Technology & analytical integrity

Built on construction logic. Designed for scrutiny.

A credible intelligence system makes its methods understandable. The Sorqis approach combines connected data, explicit analytics and accountable human oversight.

Request a Quote
Construction risk intelligence, scoped around your project requirements.
01 / The intelligence architecture

Connected data.
Inspectable reasoning.

Activity and dependency modeling provides the common context. Different analytical methods operate on that context to answer different questions.

01 / Project sources

Schedule exports, structured cost reports, procurement registers and progress records provide the operational context. Review format compatibility and data quality as part of the engagement scope.

Connected intelligence architecture · Select a stage to explore
02 / Establishing the foundation
CONNECT

Keep the
source context.

Ingest schedule, cost, procurement and progress records with their original identifiers, status dates and version information. Data lineage should survive normalization.

STANDARDIZE

Make comparisons
meaningful.

Align calendars, reporting periods and units. Review missing relationships and unresolved activity mappings before treating an input as analytically ready.

MODEL

Represent the
dependencies.

Connect activities, milestones, resources and equipment packages. Preserve physical and contractual constraints instead of reducing the project to isolated metrics.

03 / Methods with distinct jobs

Not every calculation
is an AI prediction.

Clarity about the method is part of clarity about the result. The architecture separates reproducible calculations from uncertain forecasts and generated language.

01

Deterministic analysis

What follows from the schedule as modeled?

Critical-path calculations, date propagation, float analysis and baseline comparison.

Results depend on correct calendars, constraints, activity logic and status information.
02

Rule-based detection

Which defined conditions warrant review?

Explicit checks for missing logic, threshold breaches, date inconsistencies and delivery variance.

A triggered rule is an observation. Its significance still depends on project context.
03

Statistical simulation

How could outcomes vary under uncertainty?

Analysis of duration distributions, correlated risks and outcome ranges.

Distributions and correlations need a defensible basis. A simulated range is not a guarantee.
04

Machine learning

Can historical signals improve the forecast?

Models that examine patterns in comparable project observations and outcomes.

Requires representative data, leakage controls, calibration and validation before performance claims.
05

Generative explanations

How can the finding be communicated clearly?

Evidence-linked summaries that translate analytical outputs into readable project context.

Generated language must not invent evidence or replace the underlying calculations and professional review.
04 / Validation before claims

Measure what the
forecast actually does.

Set acceptance criteria before selecting a method. Evaluate the analysis against relevant project records using the following mechanisms.

01

Historical backtesting

Recreate reporting-date conditions. Exclude information that only became available later and compare against transparent baseline methods.

02

Calibration assessment

Check whether stated uncertainty ranges reflect observed outcomes over appropriate evaluation sets.

03

Forecast error measurement

Measure date and cost forecast errors across relevant project types, horizons and data-quality conditions.

04

Outcome tracking

Compare expected mitigation effects with subsequent observations while considering changes in other project conditions.

05 / Governance by design

Project information
deserves clear controls.

Define access, retention and review responsibilities around the information your project needs to share.

Purpose & access

Define what data is required, who can access it and which project responsibilities justify that access. Apply least-privilege principles in the enterprise implementation.

Retention & traceability

Agree retention and deletion requirements with each organization. Preserve an audit trail for source changes, analytical runs and reviewed decisions.

Integration boundaries

Define import formats, scoped credentials and system boundaries for each integration. Treat project systems as authoritative sources, with explicit synchronization and error handling.

Human oversight

Give qualified reviewers the ability to challenge assumptions and reject findings. Safety-critical, contractual and operational approvals remain with authorized people.

Open technical conversations

Start with your requirements.

Data formats, deployment boundaries, security requirements and validation expectations are part of defining an engagement. A scoped quote establishes the work, deliverables and responsibilities.

Discuss a technical requirement
A clearer picture starts here

Bring your next
project into focus.

Let’s discuss your project controls challenges
and where connected intelligence could help.

Request a QuoteStart a conversation Built for the complexity of construction.