01 / Understand the sequence

See the delay before the deadline moves.

Connect activity logic, progress and milestones to understand where schedule exposure is building.

Request a Quote
Construction risk intelligence, scoped around your project requirements.
Project intelligence/DC-01
Scenario analysis
PROJECT OVERVIEW

Data center delivery scenario

Scenario workspace
Completion milestone23 Dec2026+7 working days
Schedule variance+7daysvs. accepted baseline
Modeled exposure$126kTime + intervention cost
Activity dependenciesWORKING DAYS
ACTIVITY / PACKAGE
0010203040
Current scenarioBaselineSchedule exposure◆ Completion
DEPENDENCY EXPOSURE · A030

Switchgear installation: +7 working days

Requires equipment delivery and completed foundations. Duration is ten working days, or fifteen under the resource constraint.

Review owner: Electrical lead · Source: scenario schedule and procurement register
Calculation assumptions

Switchgear delivery moves seven working days. With no spare float on this simplified chain, installation, energization and testing all move seven days. Day 0 is 2 November 2026. Monday–Friday calendar; no holidays. Finish-to-start relationships, zero lag. Site readiness finishes on day 8. Baseline completion: 14 Dec. Exposure = 7 × $18,000 daily overhead + $0 intervention. Scope excludes claims, escalation and direct labor changes.

Connected dependencies. Explainable consequences.SCENARIO ANALYSIS
The delivery challenge

A completion date is the result of thousands of connected decisions. Understand the conditions behind it.

An unchanged completion date can conceal deteriorating float, weak activity logic and late progress updates. Sorqis helps teams examine both the integrity of a schedule and the delivery risks within it.

01 / CONNECTED INPUTS

Bring the right
signals together.

  • Primavera P6 and Microsoft Project schedule exports
  • Approved baselines and current activity dates
  • Predecessor relationships, calendars and constraints
  • Actual progress, remaining durations and milestone commitments
02 / EMERGING EXPOSURE

Know where
to look closer.

  • Missing logic, open ends and questionable constraints
  • Critical and near-critical paths and float consumption
  • Activity slippage relative to the approved baseline
  • Dependency exposure and downstream milestone impacts
A practical intelligence workflow

From observation to understanding.

Workflows designed to support the professionals responsible for delivery.

01

Establish a credible baseline

Assess schedule quality before interpreting movement. Flag inconsistent status dates, missing relationships and constraints that may obscure the underlying sequence.

02

Follow the risk through the network

Link a late activity to its successors. Separate local variance from delay that can reach a contractual milestone, with calendars and relationship types made explicit.

03

Compare plausible completion dates

Evaluate changes in remaining duration and recovery assumptions. Keep the original baseline visible so a revised forecast does not erase the history of delivery commitments.

A construction example

Follow the consequence.

A delayed switchgear delivery consumes the remaining float before installation. The delivery itself is a procurement issue; its connection to energization and integrated testing makes it a completion risk.

SCHEDULE LOGIC · COST ASSUMPTIONS · PROJECT IMPACT
Value for your team

Clarity that supports
better judgment.

Support earlier schedule reviews, focused look-ahead discussions and better evidenced recovery plans. Any projected dates depend on the completeness of the schedule and stated assumptions.

Agree the scope, data requirements, analytical methods and reporting deliverables before your engagement begins.

A clearer picture starts here

Bring your next
project into focus.

Let’s discuss your project controls challenges
and where connected intelligence could help.

Request a QuoteStart a conversation Built for the complexity of construction.